Install VBC Series Products
On Top of the Footing
When vertical wall is involved, please place the membrane butt end on top of the footing and up against the vertical wall. This placement method will provide the needed protection from outside moisture following construction completion.
- Contact Us
- tel: 877-535-0555
- fax: 800-709-6002
- e-mail: info@barrierbac.com